Commercial

200A to 400A Commercial Service Upgrades in Toronto and the GTA: CT Metering, Three-Phase Panels and Utility Coordination

200A to 400A service upgrades in Toronto move commercial and large-residential service from a 200A continuous-rated service to a full 400A continuous-rated commercial service with a CT cabinet (current transformer cabinet) for utility metering, commercial switchgear or a 400A main breaker load centre from Siemens, Square D, or Eaton, bolt-on branch circuit breakers with proper short-circuit current rating (SCCR), a commercial ESA plan review submission, three-phase 120/208V or 347/600V distribution where the load profile requires it, and full commercial ESA Certificate of Acceptance. Toronto Electrical Panel Upgrade handles the utility service coordination including Toronto Hydro's Commercial Service Layout (CSL) review, the ESA commercial plan review submission with engineered load calculations, and after-hours energization work where the tenant cannot support daytime downtime. A 200A to 400A service upgrade in Toronto costs $8,000 to $22,000 CAD depending on whether the service is single-phase 240V, three-phase 120/208V, or three-phase 347/600V, whether a CT cabinet or utility transformer vault upgrade is required, and how much associated switchgear or feeder work is bundled.

Most calls start with a trigger: a new commercial tenant fit-out (restaurant, commercial kitchen, gym, warehouse), a heavy manufacturing motor load addition, an EV fleet charging installation, a landlord-required commercial service capacity increase, or a Toronto Hydro-mandated service upgrade after a load study. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km commercial radius.

  • ECRA/ESA Licensed
  • ESA Permit Included
  • Utility Coordination Handled
  • Written Itemised Quote
Written itemised quote

$ 5,000 to $15,000 CAD

  • ESA permit filed and inspection booked
  • Utility disconnect and reconnect coordinated
  • Same-Week Scheduling
View Pricing Detail
  • ECRA/ESA Licensed
  • ESA Permit Included on Every Job
  • Same-Week Scheduling
  • WSIB Certified
  • Free Written Itemised Quote

What Is a 200A to 400A Service Upgrade?

A 200A to 400A service upgrade doubles the continuous capacity of a commercial or large-residential service. Practically it means new service entrance conductors, a CT cabinet for utility metering, either commercial switchgear or a 400A main with distribution panels downstream, and a coordinated cutover so the property is not without power longer than planned.

It is a different animal from a residential panel upgrade in three ways. First, metering: above roughly 200A the utility meters through current transformers, so a CT cabinet enters the design and the utility specifies its type and position. Second, plan review: the Electrical Safety Authority reviews the design against the Ontario Electrical Safety Code (OESC) before installation, which means a single-line diagram, a load study and a short-circuit current rating check. Third, continuity: a business cannot simply lose power for a day, so the cutover is planned, phased or moved after hours.

The trigger is almost always added load. Commercial HVAC, a kitchen fit-out, refrigeration, tenant improvements, or EV charging for a fleet or staff parking. Sometimes it is a landlord upgrading base-building capacity before leasing.

For the commercial range, see commercial electrical panel upgrades.

Configuration Options

  • 400A single-phase with CT cabinet. Suits large residential, small retail and light commercial where three-phase is unavailable or unnecessary.
  • 400A three-phase 120/208V. The standard commercial arrangement where three-phase supply exists. Better for motor and kitchen loads.
  • 400A with commercial switchgear. Bolt-on breaker switchgear with distribution downstream, for multi-tenant or multi-panel properties.
  • 400A feeding twin 200A panels. Common on very large homes where the demand calculation exceeds a single 200A service.

When a 400A Service Becomes Necessary

  • Commercial HVAC is being added or replaced. Rooftop units and larger air handlers are the most common single driver.
  • A commercial kitchen is going in. Three-phase appliance loads add up fast. See restaurant electrical upgrades.
  • Tenant improvements exceed base-building capacity. A landlord’s 200A service was never sized for today’s tenant loads. See retail electrical upgrades.
  • Refrigeration or process equipment. Continuous motor loads that consume calculated capacity disproportionately.
  • Fleet or staff EV charging. Several Level 2 chargers, or any DC fast charging, is a 400A conversation minimum.
  • A very large home. Two chargers, a pool, electric heating and a secondary kitchen can exceed 200A on the calculation.

What Drives the Cost Between $5,000 and $15,000

Phase configuration is the biggest factor: three-phase distribution costs materially more than single-phase because of the equipment and the conductor count. Switchgear versus a main breaker panel is second, driven by how many downstream feeders the property needs. Cutover constraints are third, since an after-hours phased cutover with temporary power costs more than a straightforward daytime change. Utility infrastructure is the fourth and least predictable: if the supply at the property has to change, the utility’s own work and timeline enter the picture.

The commercial ESA plan review, the utility coordination and any temporary power are itemised separately so you can see what each part costs.

What to Expect on the Project

The early weeks are paperwork and lead times: the utility service application, the ESA plan review submission, and equipment ordering once the CT cabinet arrangement is confirmed. We give you a schedule built around those dependencies rather than the install duration.

On site, the new service entrance, CT cabinet and switchgear or main panel are installed alongside the existing service where the layout allows, so the cutover is short. Feeders are run to distribution panels, terminations are torqued to specification, and every panel is scheduled and labelled.

The cutover happens in the agreed window. The ESA inspector attends, the utility energizes and sets metering, and you receive the as-built panel schedules, the final single-line diagram, the Certificate of Inspection and the itemised invoice for the building file.

When a Business Needs a 400A Service: HVAC Loads, Kitchen Loads, Tenant Split, and Fleet Charging

A 400A service becomes the right answer when the OESC Section 8 demand calculation for the property exceeds a 200A ceiling, or when the physical layout of the property calls for two separate distribution zones. In Toronto and the surrounding GTA, four load profiles drive most 400A upgrades.

HVAC-driven upgrades

  • Rooftop packaged units on a commercial or industrial roof: a Carrier, Trane or York 10-20 ton RTU pulls 50-100A of continuous load per unit.
  • Multiple mini-split heat pumps on a converted commercial or mixed-use property: ten to twenty indoor heads on Mitsubishi City Multi or Daikin VRV distribute load across multiple large outdoor units.
  • Cold-climate heat pump conversion in a multi-tenant building: replacing gas heat with an electric heat pump system typically pushes any building with more than three units above 200A.
  • Large air handlers with electric duct heaters: duct-mounted electric heat elements in a 50-100 kW range.

Commercial kitchen and appliance loads

  • Full-service restaurant kitchen: electric ranges, convection ovens, deep fryers, dishwashers, walk-in freezers and hoods together often exceed 150A of connected demand.
  • Cloud kitchen or ghost kitchen operations: high-density electric cooking equipment in a small footprint.
  • Bakery, ice cream, or specialty food production: dedicated mixers, ovens, refrigeration and packaging equipment on discrete circuits.

Multi-tenant and mixed-use splits

  • Two ground-floor commercial tenants each with 100A service: 200A of tenant load plus common-area lighting and HVAC pushes the base building above 200A.
  • Live-work property with a commercial ground floor and a residential unit above: each dwelling needs its own service or subpanel, and the sum drives the main service size.
  • Small retail plaza with three to five tenants: typically served by a 400A main service with individual tenant subpanels metered separately.

Fleet and vehicle charging

  • Multi-vehicle fleet charging on a commercial property: three or more Level 2 chargers or a single Level 3 DC fast charger.
  • Bus, van or delivery-truck depot charging: requires substantial service capacity, often with load management or scheduled charging.
  • Multi-unit residential parking with shared EV charging: a Toronto Hydro or Alectra Utilities interconnection may push the building service to 400A or beyond.

How Much Does 200A to 400A Upgrades Cost in Toronto?

Commercial 200A to 400A upgrades run $5,000 to $15,000 CAD. The commercial ESA plan review, utility coordination and phased energization are itemised separately.

Typical range

$ 5,000 to $15,000

per upgrade (CAD)

  • ESA permit fee included
  • Final ESA inspection included
  • Utility coordination itemised, never hidden
Get an Itemised Quote

What Moves the Price

Overhead mast or underground lateral

An underground service entrance needs trenching and civil work, so it sits higher in the range than a mast and weatherhead replacement.

Panel brand and circuit count

Siemens, Square D / Schneider Electric and Eaton load centres price differently, and a 42-circuit panel costs more than a small enclosure.

Service entrance length and routing

Conductor length from the meter base to the panel, plus any wall penetration or conduit work, changes the material and labour line.

Scope flagged by the load calculation

An OESC Section 8 result can add a subpanel, a grounding electrode conductor or a meter base that was not in the original plan.

Scope Low High
400A single-phase with CT cabinet $ 5,000 $ 9,000
400A three-phase 120/208V with distribution $ 8,000 $ 13,000
400A with switchgear and phased cutover $ 10,000 $ 15,000

Why Choose Us for 200A to 400A Upgrades?

ECRA/ESA licensed, permit filed, utility coordinated, quote itemised.

  • 20+ Years of Panel Upgrade Experience

    Over two decades of ECRA/ESA-licensed panel replacement, service entrance upgrades, fuse box conversions and utility coordination across Toronto and the GTA. Panel work is the whole business, not a side service.

  • Plan review handled for you

    Commercial upgrades need drawings and a load study before install. We produce and submit the package rather than asking you to find a consultant.

  • Downtime planned, not improvised

    Phased cutovers and after-hours windows are scoped in the quote, so operations know exactly when power is interrupted.

  • SCCR verified

    Short-circuit current rating is checked against the available fault current rather than assumed from the equipment label.

  • CT metering coordinated

    The CT cabinet arrangement is agreed with the utility before equipment is ordered, which is where most commercial projects stall.

How Does 200A to 400A Upgrades Work?

The sequence every job follows, from the first load calculation to the utility reconnect.

  1. 01

    Load study

    Connected load, demand factors and growth allowance, assembled into the single-line diagram the plan review needs.

  2. 02

    Utility service application

    Service application with the utility covering supply capacity, CT cabinet arrangement and whether three-phase is available at the property.

  3. 03

    Commercial ESA plan review

    Drawings, load study and short-circuit current rating submitted for review before any equipment is ordered.

  4. 04

    Install and phased cutover

    Switchgear, CT cabinet and distribution installed, with the cutover phased or scheduled after hours to protect operations.

  5. 05

    Inspection and energization

    ESA inspection, utility energization, and as-built panel schedules handed over with the certificate.

How Toronto Electrical Panel Upgrade Compares

Feature Typical provider Toronto Electrical Panel Upgrade
Load study Estimated from panel size Connected load and demand study for the plan review
ESA plan review Client's responsibility Prepared and submitted by us
Downtime Full-day shutdown Phased or after-hours cutover in the quote
Short-circuit current rating Assumed Verified against available fault current

Need 200A to 400A Upgrades in Toronto or the GTA?

Free on-site estimate, written itemised quote, ESA permit filed before the work starts.

Our 200A to 400A Upgrades Work

Documentary photos from panel jobs across Toronto and the GTA. Select any image to enlarge it.

What Customers Say About Our 200A to 400A Upgrades Work

Real Toronto and GTA neighbourhoods, real panel jobs.

We were adding HVAC and kitchen load to a 200A service. The load study and plan review were handled and the cutover happened overnight.
Marco S.Liberty Village
The CT cabinet arrangement was agreed with the utility before anything was ordered, which is where our last contractor got stuck for weeks.
Helen T.Leslieville
Three-phase was available at the property and they confirmed it with the utility first rather than quoting single-phase and revising later.
Raj P.Etobicoke

200A to 400A Upgrades FAQs

How much does a 200A to 400A service upgrade cost in Toronto?

Commercial 200A to 400A upgrades run $5,000 to $15,000 CAD. A 400A single-phase service with a CT cabinet sits at the lower end. Adding three-phase 120/208V distribution, switchgear, or a phased cutover that has to happen after hours moves it up. The commercial ESA plan review, utility coordination and any temporary power are itemised separately.

What is a CT cabinet and why do I need one?

Above roughly 200A, utilities meter through current transformers rather than passing the full service current through the meter. The CT cabinet houses those transformers and the metering connections. The arrangement has to be agreed with the utility before equipment is ordered, because they specify the cabinet type and position.

Do I need three-phase power?

It depends on your equipment. Three-phase 120/208V is more efficient for motor loads, commercial HVAC, commercial kitchen equipment and larger refrigeration. It is also not available at every address, so the first step is confirming with the utility what supply exists at the property. Where it is not available, a 400A single-phase service often still solves the capacity problem. See [three-phase electrical service upgrades](/three-phase-electrical-service-upgrades/).

What is a commercial ESA plan review?

For commercial and industrial work, the Electrical Safety Authority reviews the design before installation: single-line diagram, load study, equipment ratings and short-circuit current rating. It is a separate step from the final inspection and it takes time, which is why we submit it early rather than after equipment arrives.

How long will my business be without power?

That depends on the cutover plan, which is part of the quote rather than an afterthought. Many commercial upgrades are done with a phased cutover or an after-hours window so trading hours are protected. Where a continuous supply is essential, temporary power is priced as its own line.

What is short-circuit current rating and why does it matter?

SCCR is the maximum fault current equipment can safely interrupt. As a service gets larger and closer to the transformer, available fault current rises, and equipment with an inadequate rating becomes a serious hazard. We check the available fault current against the equipment rating rather than assuming the label is sufficient.

Is this the same as a large-residential 400A service?

The equipment and utility process are similar. A very large home with two EV chargers, a pool, electric heating and a secondary kitchen can exceed 200A on the demand calculation, and the answer is usually a 400A service feeding twin 200A panels. The plan review requirement is lighter for a dwelling than for a commercial occupancy.

How long does the whole project take?

The install itself is measured in days, but the project timeline is driven by the utility service application and the ESA plan review, which are measured in weeks. We submit both as early as possible and give you a realistic schedule rather than an optimistic one.

Can you coordinate with our general contractor?

Yes. On fit-outs and renovations we work to the GC's programme, attend site meetings where needed, and sequence the service work around other trades. See [restaurant electrical upgrades](/restaurant-electrical-upgrades/) and [office electrical upgrades](/office-electrical-upgrades/) for typical build-out scopes.

Do we get as-built documentation?

Yes. Panel schedules for every distribution panel, the final single-line diagram, the ESA certificate and the itemised invoice. Property managers and landlords generally require the schedules and the certificate for the building file.

Still have a question?

Ask the crew directly. We answer load calculation, permit and utility coordination questions before you commit to anything.

Related Services

Restaurant Electrical Upgrades

Restaurant electrical upgrades in Toronto size and install the commercial kitchen electrical service required for a restaurant fit-out, cloud kitchen, catering commissary, or ghost kitchen. Toronto Electrical Panel Upgrade calculates the OESC Section 8 continuous kitchen load including hood exhaust makeup air unit (MAU), walk-in refrigeration, six-burner range, deep fryer, salamander broiler, convection oven, low-temp and high-temp dishwasher circuits, three-phase equipment feeders for combi ovens and pizza ovens, and general receptacle and lighting distribution. We coordinate three-phase 120/208V or 347/600V service with Toronto Hydro or Alectra Utilities, submit the commercial ESA plan review with engineered load calculations, phase energization around the general contractor's schedule, install service disconnect switches sized for restaurant equipment inrush current, and deliver Certificate of Acceptance in time for Toronto Public Health and City of Toronto business licensing inspection. A restaurant electrical service upgrade in Toronto costs $8,000 to $30,000 CAD depending on the size of the kitchen (fast-casual vs full-service vs commissary), whether a service upgrade from 200A to 400A or 600A is required, and how much distribution panel and feeder work is bundled with the service work. Most calls start with a trigger: a new restaurant lease build-out, a cloud kitchen conversion, a catering commissary relocation, a landlord-required service upgrade before tenant fit-out, or a Toronto Public Health kitchen expansion permit. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km commercial radius.

View service

Office Electrical Upgrades

Office electrical upgrades in Toronto install per-floor tenant subpanels, workstation circuit distribution, IT closet dedicated feeders, and open-plan lighting circuits for downtown Toronto office fit-outs, professional building tenant improvements, and shared-office coworking build-outs. Toronto Electrical Panel Upgrade coordinates commercial ESA plan review, three-phase 120/208V distribution from the base building service to the tenant demarcation, per-floor subpanel installations with dedicated 20A workstation circuits and separate circuits for network switches and server closets, submetering integration for tenant billing where the base building requires it, and after-hours cutover to minimise business day downtime during the energization phase. Every install includes proper phase balancing across the tenant panel, arc-flash labelling, and a Certificate of Acceptance for the base building operator and tenant improvement contract. An office electrical upgrade in Toronto costs $6,000 to $18,000 CAD per floor depending on square footage, workstation count (20 vs 60 vs 120 stations), whether IT closet cooling requires dedicated circuits, and whether the base building service supports the load without an upstream distribution upgrade. Most calls start with a trigger: a new office tenant fit-out, a coworking build-out, a professional building tenant relocation, a landlord-required tenant improvement service upgrade, or an office IT infrastructure refresh requiring dedicated feeders. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km commercial radius.

View service

Three-Phase Electrical Service Upgrades

Three-phase electrical service upgrades in Toronto install or convert existing single-phase 240V service to three-phase 120/208V wye or three-phase 347/600V wye distribution for restaurants, gyms, offices, warehouses, machine shops, and light manufacturing facilities whose motor and equipment loads cannot run efficiently on single-phase power. Toronto Electrical Panel Upgrade coordinates the three-phase service upgrade with Toronto Hydro Commercial Service Layout (CSL) review or Alectra Utilities equivalent, submits the commercial ESA plan review with an engineered short-circuit current rating (SCCR) analysis, installs commercial-grade three-phase switchgear or a main distribution panel from Siemens, Square D, or Eaton, verifies proper phase rotation and phase-to-phase balance, adds arc-flash labelling per CSA Z462, and integrates utility-approved CT metering for revenue-grade tenant billing. A three-phase service upgrade in Toronto costs $12,000 to $45,000 CAD depending on service amperage (200A vs 400A vs 800A three-phase), voltage class (208V wye vs 600V wye), whether a new utility transformer vault or padmount transformer is required, and how much downstream distribution panel and feeder work is bundled. Most calls start with a trigger: a new tenant equipment installation requiring three-phase motor loads, an upsize from single-phase service to support HVAC rooftop units and elevator motors, a manufacturing plant expansion, or a utility-mandated conversion after a load study showing existing service cannot carry continuous demand. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, and outer-GTA industrial parks on Hydro One inside our 50km commercial radius.

View service
Same-Week Scheduling

Book Your 200A to 400A Upgrades Estimate

Free on-site assessment across Toronto and the GTA. Written itemised quote before any work begins, with the ESA permit fee and utility coordination fee separated on the line.

  • ESA permit and final inspection included
  • Toronto Hydro coordination handled
  • No hidden fees on the written quote