Skip to main content
Crew terminating three-phase feeders in a commercial kitchen distribution panel

Restaurant Electrical Service Upgrades in Toronto

Size and upgrade service for a commercial kitchen build-out, coordinating three-phase equipment loads with the GC and utility.

  • ECRA/ESA Licensed
  • ESA Permit Included
  • Utility Coordination Handled
  • Written Itemised Quote
Written itemised quote

$ 5,000 to $15,000 CAD

  • ESA permit filed and inspection booked
  • Utility disconnect and reconnect coordinated
  • Same-Week Scheduling
View Pricing Detail
  • ECRA/ESA Licensed
  • ESA Permit Included on Every Job
  • Same-Week Scheduling
  • WSIB Certified
  • Free Written Itemised Quote

What Is a Restaurant Electrical Upgrade?

A restaurant electrical upgrade sizes and installs the service and distribution a commercial kitchen actually needs. It starts from the equipment schedule: every range, fryer, combi oven, dishwasher, walk-in, hood and make-up air unit, with nameplate ratings and phase requirements, assembled into a load profile with the right demand factors applied.

That profile decides two things. Whether the existing service carries the fit-out or a 400A upgrade is needed, and how the distribution is laid out so each appliance lands on a correctly sized feeder. Commercial kitchen equipment is unforgiving about this: an undersized feeder shows up as nuisance tripping during service, which is the worst possible time to discover it.

The second half of the job is sequencing. Rough-in has to happen before millwork and equipment arrive. Terminations happen once equipment is on site. The ESA inspection, which confirms the installation meets the Ontario Electrical Safety Code (OESC), and the hood and suppression interlocks have to be complete before the occupancy and fire inspections. We work to the general contractor’s programme rather than around it.

For the commercial range, see commercial electrical panel upgrades.

Typical Scopes

  • Distribution upgrade only. The base-building service is adequate but the panel layout is not. New distribution panels and appliance feeders.
  • 400A service upgrade with kitchen distribution. The usual full fit-out scope where the existing service was sized for a retail unit. See 200A to 400A service upgrades.
  • Three-phase conversion. Where three-phase supply is available and the equipment schedule justifies it.
  • Phased upgrade around an operating restaurant. Distribution work after hours, final cutover on a closed day.

When a Restaurant Needs Electrical Work First

  • A new fit-out in an existing unit. Previous tenant’s service was almost never sized for your kitchen.
  • Adding a combi oven, fryer bank or larger dishwasher. Single pieces of equipment that can exceed remaining capacity on their own.
  • Refrigeration expansion. Walk-in and reach-in compressors are continuous loads that consume calculated capacity disproportionately.
  • Hood and make-up air replacement. Interlocks, shunt trips and motor loads all touch the electrical scope.
  • Nuisance tripping during service. The clearest signal that the distribution was never sized for the equipment actually installed.
  • A patio or second service area. Outdoor heating, lighting and point-of-sale loads on a service with no headroom.

What Drives the Cost Between $5,000 and $15,000

Whether the service itself changes is the biggest factor. A distribution-only upgrade is materially cheaper than a full 400A service change with a CT cabinet. Phase configuration is second, as three-phase distribution costs more in equipment and conductors. Appliance count and spread is third, because every dedicated feeder is a conduit run and a termination. Operating constraints are fourth: after-hours work and temporary power to keep refrigeration running both add cost.

The commercial ESA plan review and the utility coordination are itemised separately so you can see them in the quote rather than finding them in a labour line.

What to Expect Through the Build

Early on, the work is documentation and lead times. We assemble the load profile from your equipment schedule, prepare the single-line diagram, submit the commercial ESA plan review, and file the utility service application if the service is changing. Those timelines drive the project schedule.

Rough-in happens before millwork: feeders pulled, distribution panels set, appliance circuits run in conduit to their positions, and hood, make-up air and suppression interlock wiring pulled ready for the mechanical trades. Once equipment is delivered, terminations are made to nameplate requirements, interlocks are commissioned with the hood and suppression contractors, and each feeder is tested.

The ESA inspector attends, and where the service changed the utility energizes and sets metering. You receive panel schedules labelled by appliance, the final single-line diagram, the Certificate of Inspection, and the itemised invoice, which is the package the landlord and the occupancy inspection both want to see.

How Much Does Restaurant Upgrades Cost in Toronto?

Restaurant service and distribution work runs $5,000 to $15,000 CAD depending on the appliance load profile and whether the service itself is being upgraded.

Typical range

$ 5,000 to $15,000

varies by scope (CAD)

  • ESA permit fee included
  • Final ESA inspection included
  • Utility coordination itemised, never hidden
Get an Itemised Quote

What Moves the Price

Overhead mast or underground lateral

An underground service entrance needs trenching and civil work, so it sits higher in the range than a mast and weatherhead replacement.

Panel brand and circuit count

Siemens, Square D / Schneider Electric and Eaton load centres price differently, and a 42-circuit panel costs more than a small enclosure.

Service entrance length and routing

Conductor length from the meter base to the panel, plus any wall penetration or conduit work, changes the material and labour line.

Scope flagged by the load calculation

An OESC Section 8 result can add a subpanel, a grounding electrode conductor or a meter base that was not in the original plan.

Scope Low High
Distribution upgrade, existing service adequate $ 5,000 $ 8,000
400A service upgrade with kitchen distribution $ 8,000 $ 12,000
Service upgrade with three-phase and phased energization $ 11,000 $ 15,000

Why Choose Us for Restaurant Upgrades?

ECRA/ESA licensed, permit filed, utility coordinated, quote itemised.

  • We work from the equipment schedule

    Nameplate ratings from the actual appliance list, not a per-square-foot estimate that leaves you short on opening week.

  • Sequenced to the build programme

    Rough-in before millwork, terminations after equipment delivery, inspection timed so it does not hold up the occupancy sequence.

  • Three-phase coordinated early

    Whether three-phase exists at the property is confirmed with the utility before equipment is specified, not after it arrives.

  • Panels labelled for operators

    Feeders labelled by appliance so kitchen staff and future service techs can isolate one piece of equipment without guessing.

How Does Restaurant Upgrades Work?

The sequence every job follows, from the first load calculation to the utility reconnect.

  1. 01

    Appliance load profile

    Every piece of equipment from the kitchen schedule, with nameplate ratings, phase requirements and demand factors applied.

  2. 02

    Service and distribution sizing

    Whether the existing service carries the fit-out or a 400A upgrade is required, and how many distribution panels the layout needs.

  3. 03

    Plan review and utility

    Commercial ESA plan review submitted with the single-line diagram, and the utility service application filed where the service changes.

  4. 04

    Rough-in with the GC

    Conduit, feeders and equipment circuits installed to the GC's programme, before millwork and equipment arrive.

  5. 05

    Energization and inspection

    Equipment terminated and tested, ESA inspection completed, and panels scheduled for the health and fire inspections that follow.

How Toronto Electrical Panel Upgrade Compares

Feature Typical provider Toronto Electrical Panel Upgrade
Load basis Per square foot estimate Appliance-by-appliance nameplate load profile
Three-phase availability Assumed Confirmed with the utility before spec
Scheduling Fit around other trades Sequenced to the GC programme in the quote
Panel labelling Circuit numbers only Labelled by appliance for operators

Need Restaurant Upgrades in Toronto or the GTA?

Free on-site estimate, written itemised quote, ESA permit filed before the work starts.

Our Restaurant Upgrades Work

Documentary photos from panel jobs across Toronto and the GTA. Select any image to enlarge it.

What Customers Say About Our Restaurant Upgrades Work

Real Toronto and GTA neighbourhoods, real panel jobs.

They worked from our equipment schedule rather than guessing. Every feeder was sized for the appliance that landed on it and nothing tripped on opening week.
Dimitri A.Little Italy
Three-phase was confirmed with the utility before our supplier ordered the combi oven. That one call saved a specification change.
Carla V.Queen West
Rough-in happened before millwork and the terminations were done the week equipment arrived. Our GC did not have to chase them once.
Nick B.Roncesvalles

Restaurant Upgrades FAQs

How much does a restaurant electrical upgrade cost in Toronto?

Restaurant service and distribution work runs $5,000 to $15,000 CAD. A distribution upgrade where the existing service is already adequate sits at the lower end. A 400A service upgrade with new kitchen distribution, or three-phase work with a phased energization around an operating business, moves toward the top. The commercial ESA plan review and utility coordination are itemised.

Do I need three-phase power for a commercial kitchen?

Most commercial kitchens benefit from it, and much commercial equipment is specified for three-phase 120/208V. Combi ovens, larger fryers, dishwashers and refrigeration run more efficiently and with lighter conductors on three-phase. The constraint is availability at the property, which we confirm with the utility before anything is specified. See [three-phase electrical service upgrades](/three-phase-electrical-service-upgrades/).

When in the build should the electrician be involved?

As early as the equipment schedule exists. The appliance list drives the service size, the distribution layout and the plan review submission, and all three have lead times measured in weeks. Bringing us in after millwork is installed is how fit-outs end up with a service that cannot carry the kitchen.

What is an appliance load profile?

A line-by-line list of every piece of equipment with its nameplate current, voltage and phase requirement, with the applicable demand factors applied to get a realistic calculated load. It is the difference between a service that runs comfortably at full covers and one that trips during dinner service.

Can the work happen while we stay open?

Often yes, with a phased approach. Distribution work can frequently be done outside trading hours, and the final cutover scheduled for a closed day. Where the service itself is being replaced there will be a defined outage, and we scope it in the quote rather than surprising you with it.

Does the electrical work affect our health or fire inspection?

Indirectly, yes. Hood and make-up air interlocks, fire suppression shunt trips and walk-in refrigeration alarms are all electrical scope that those inspections look at. We coordinate with the hood and suppression contractors so the interlocks are wired and tested before those inspections rather than after.

Who handles the ESA plan review?

We prepare and submit it: single-line diagram, load study, equipment ratings and short-circuit current rating. It is a distinct step before installation and separate from the final inspection, and skipping it stalls the project at energization.

What about the walk-in and refrigeration circuits?

Refrigeration is continuous motor load and gets dedicated circuits sized accordingly, with the compressor and condenser loads counted properly in the calculation. Alarm and monitoring circuits are kept separate from the power feeds so a tripped compressor does not take the alarm with it.

Can you label panels for kitchen staff?

Yes, and we do it by default. Feeders labelled by appliance rather than circuit number means a manager can isolate one fryer at 11pm without calling anyone. Panel schedules are fixed inside each door.

Do you work with our general contractor?

Yes. On fit-outs we work to the GC's programme, attend coordination meetings where needed, and sequence rough-in, terminations and inspection around the other trades.

Still have a question?

Ask the crew directly. We answer load calculation, permit and utility coordination questions before you commit to anything.

Same-Week Scheduling

Book Your Restaurant Upgrades Estimate

Size and upgrade service for a commercial kitchen build-out, coordinating three-phase equipment loads with the GC and utility. Free on-site assessment across Toronto and the GTA.

  • ESA permit and final inspection included
  • Toronto Hydro coordination handled
  • No hidden fees on the written quote

Request a Written Itemised Quote

Four fields. We reply with a free on-site estimate date and the ESA permit and coordination fees broken out separately.

Prefer to talk? Call +1-647-577-6113

Call the Crew Free Estimate